35,000 L Fuel Tanker Semi Trailer | ADR Certified 3 Axle Tanker by Alura - ALURA TRAILER

Need a robust, ADR-ready fuel/oil tanker trailer that delivers safety, efficiency, and long service life? Alura Trailer presents the 35,000 L 3 Axle Tanker Semi Trailer—engineered for petroleum, diesel, and similar liquid cargo with uncompromising quality.

35,000 L Tanker Semi Trailer Side View

Main Features

  • Nominal Volume: 35,000 L (elliptical tank with anti-wave baffles)
  • Gross Vehicle Weight: Up to 41,000 kg
  • Payload Capacity: ~33,400 kg (config-dependent)
  • Tare Weight: Approx. 7,600–7,900 kg
  • Axles: 3 × 9,000 kg (SAF/BPW/local options)
  • Tyres: 385/65 R22.5 single
  • Material Options: Carbon steel S235JR/S355JR (5–6 mm) or Stainless (AISI 304/316); Aluminum on request
  • Compartments: 3–5 configurable (e.g., 15k + 10k + 10k)
  • Loading/Discharge: Top/Bottom loading, API bottom valves, vapor recovery, overfill protection
  • Brakes & Safety: WABCO EBS (2S/2M) with RSS; fire extinguishers, earthing, emergency shut-off
  • Compliance: ADR / EC Type Approval (export-ready)
  • Paint System: 2-component epoxy primer + polyurethane topcoat
Rear View with Valves and Hose Cabinet

Why Choose Alura?

✅ Baffled elliptical tank—stable handling and safer braking

✅ API bottom valves, overfill sensors, vapor recovery for faster and safer operations

✅ ADR / EC certified production with full export documentation

✅ Delivered to 30+ countries with reliable after-sales support

Technical Drawing

35,000 L Tanker Trailer Technical Drawing

Global Delivery

Bottom Loading at Terminal Tanker on Highway Valve Cabinet and Flow Meter Baffles and Manholes Close-up

Alura on YouTube

Download PDF or Request a Quote

Frequently Asked Questions

Is the trailer ADR compliant?
Yes. Our tanker trailers are designed and produced according to ADR and EC Type Approval, with full documentation for export.


How many compartments can I have?
We offer fully configurable layouts (3–5 compartments) and can integrate API bottom loading, overfill protection, and vapour recovery.


What is the production time?
Typical lead time is 4–6 weeks depending on configuration and capacity.

Move your fuel safely and efficiently. Choose Alura Trailer—where quality meets performance.

#TankerTrailer #FuelTanker #ADR #SemiTrailer #AluraTrailer #BuiltToHaul